3g. Mount other side of vertical picket handrail to
switchback bracket installed in steps 3a/b using
one
3/8”-16 x 2.5” bolt on the bottom slot.
3h. Once the vertical picket handrail is positioned,
tighten the serrated nuts holding the on-coming
ramp with a 9/16” open end wrench.
Install another set of serrated nuts to the 5”
bolts to attach the vertical picket handrail.
4.
Once all hand rails have been installed, insert
round plug caps to ends of all handrails.