5.

 

Insert left and right step top posts over legs 
(from step 1).   
 
 
 
 
 
 
 
 
 
Note the longer rails from the top posts 
should point to the platform handrails and 
the shorter rails should point towards the 
steps.  

 

 

6.

 

Join upper and lower platform handrails 
with upper and lower rails from step top 
posts using elbows.  Cutting is required.  
Make sure to remove any sharp edges after 
cutting. 

    

 

Summary of Contents for New Step Breeze

Page 1: ...tallation guide will cover how to install the new step system Tools Required Impact Driver Drill 3 8 socket 7 16 socket and or wrench 9 16 socket 3 16 allen bit wrench drill bit Level Pipe cutter hacksaw table saw if cutting is required Sanding Filing tool to remove burs and sharp edges after cutting ...

Page 2: ...p assembly Leg length will be dependent on rise of platform Legs should extend above platform 12 18 2 Assemble two universal bracket assemblies each assembly consisting of One 3 universal bracket Two 3 8 16 x 1 25 hex head bolts Insert them into the platform side channel ...

Page 3: ... assemblies from step 2 with the brackets on the leg receiver on the step assembly Steps should be centered 4 Ensure the legs inserted into the step assembly in step 1 is firmly grounded and lock the leg with a 3 8 16 x set bolt and 14 x 1 drilling screw in predrilled tapped holes ...

Page 4: ... from the top posts should point to the platform handrails and the shorter rails should point towards the steps 6 Join upper and lower platform handrails with upper and lower rails from step top posts using elbows Cutting is required Make sure to remove any sharp edges after cutting ...

Page 5: ... Make sure to remove any sharp edges after cutting Join the cut handrails to the step upper and lower posts with elbows There will be a total of 4 step handrails two per side 8 Fasten step left and right top posts to legs with 14 x 1 drilling screws ...

Page 6: ...step 11 if you are installing a gate 11 The next steps will cover installing a gate to the step system Assemble the gate hinges to the gate and test fit against step upper post Gate can be installed on either left or right step upper posts Mark and drill lower gate bracket first 12 Fasten each gate bracket to step upper post using Two 20 x 2 hex head bolts Four washers Two 20 acorn nuts platform s...

Page 7: ...Repeat for upper gate bracket 13 Insert plastic black square cap to top of gate square tube on latch side Test gate and latch functionality Gate install complete ...