L M K 0 3 0 0 2 C
E V A L U A T I O N B O A R D O P E R A T I N G I N S T R U C T I O N S
5
Read first, Basic Operation (Continued)
3. Connect…
•
PC directly to the evaluation board with the LPT to uWire cable, plugging the cable
into an LPT port on the computer and then the 10 pin ribbon connector to the
evaluation board. This setup is shown below. The cable can be removed after
programming to minimize noise and EMI.
or
•
Available separately, the USB <--> uWire board to the PC with the USB cable and the
USB <--> uWire board to the evaluation board with the 10 pin ribbon cable.
LPT Setup