background image

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

National

 

Ventilation

 

Stathe

 

Road

 

Burrowbridge

 

Somerset

 

TA7

 

0RY

 

 

Website:

 

www.nationalventilation.co.uk

  

 

 

 

 

 

email:

 

info@nvagroup.co.uk

 

Sales

 

and

 

technical

 

hotline:

 

01823

 

690290

 

 

475018 E                                            

 

 

 

 

 

 

                                        1018 

Summary of Contents for Monsoon MON-HRU/230-100

Page 1: ...MON HRU 230 100 MON HRU 330 100 MON HRU 400 150 Installation Commissioning PLEASE RETAIN THESE INSTRUCTIONS WITH THE PRODUCT...

Page 2: ...ervised to ensure that they do not play with the appliance INSTALLATION GUIDANCE 1 The installer is responsible for the installation and electrical connection of the MON HRU system on site It is the r...

Page 3: ...ol 24 Maintenance 26 Filter Maintenance 26 12 Monthly Maintenance 26 PRODUCT FICHE 27 UK Building Regulations Part F Declaration of Conformance MON HRU 230 100 AND MON HRU 400 150 units conform to the...

Page 4: ...igned for continuous 24 hour exhaust ventilation of stale moist air from bathrooms toilets and kitchens As the stale air is extracted a heat exchanger within the unit transfers up to 94 of the heat an...

Page 5: ...le phase 220 240 V AC single phase 220 240 V AC single phase AC Frequency Input 50 Hz nominal 50 Hz nominal 50 Hz nominal Rated Power 150 W max 160 W max 190 W max Physical Height excluding spigots 55...

Page 6: ...Installation 6 Figure 4 MON HRU 400 150 Dimensions MON HRU 230 100 Performance graph for Vertical Discharge Note Graph show 2 typical system curves with total unit input power in Watts...

Page 7: ...HRU 330 100 Performance graph for Vertical and Horizontal Discharge MON HRU 400 150 Performance graph for Vertical and Horizontal Discharge Note Graph show 2 typical system curves with total unit inp...

Page 8: ...ppropriate lifting techniques and appliances when moving heavy equipment Check Site Requirements and Safety Notices Check that the physical and environmental conditions for the site meet or exceed the...

Page 9: ...w the unit to be installed in the opposite orientation Installing the Unit in the Opposite Orientation LH Condensate Installing the unit in the opposite orientation involves removing the front cover a...

Page 10: ...onnect the connection looms 7 Disconnect all the wiring looms from control panel 8 Remove the 2 screws and detach the rear Cable Inlet Plate Note that the grommets shown may be replaced by easy knock...

Page 11: ...on continue on page 11 or for horizontal discharge condensate connection go to page 12 Vertical Discharge Condensate Installation Note The 22 mm diameter condensate pipe is suitable for standard 22 mm...

Page 12: ...e there is a minimum 3 degree fall to allow condensate drainage Both left hand and right hand condensate drain pipes are supplied for use as appropriate depending on the orientation of the unit 4 Go t...

Page 13: ...L MOUNTING on pages 15 to 18 for information on marking out the wall for the position of the condensate drain and wall mounting brackets Fit Vertical discharge 32mm waste pipe fitted with 22 32mm redu...

Page 14: ...the spigots 1 Remove the spigot by unscrewing the screw s securing it to the chassis Then pull the spigot firmly from the entry exit hole 2 Remove the blanking cap by unscrewing the screw s securing i...

Page 15: ...ow of screws 3 Mark the condensate and wall bracket positions 4 Fit the stand off feet in place supplied in the accessory bag 5 Fit metal wall bracket supplied to the wall using appropriate fixings 6...

Page 16: ...Installation 16 MON HRU 230 100 MON HRU 330 100 Wall Mounting Dimensions...

Page 17: ...and wall bracket positions using the drawing below 4 Fit metal wall bracket supplied to the wall using appropriate fixings 5 Fit the stand off feet in place supplied in the accessory bag 6 Lift unit...

Page 18: ...Installation 18 MON HRU 400 150 Wall Mounting Dimensions...

Page 19: ...uct 100 150 mm long extended to its full length when connecting to ductwork 2 Securely connect this ducting to the spigots using worm drive clips cable ties or duct tape 3 Insulate any ducting passing...

Page 20: ...on the control unit may be used Table 1 Mains Cable Connections Terminal No Name Cable connection Description L Mains Live Brown 220 240 V AC 50 Hz input N Mains Neutral Blue 220 240 V AC 50 Hz input...

Page 21: ...the power cable supplied is already connected to the unit and routed through the Cable Inlet Plate via a suitable gland to ensure the IP rating of the unit is not affected 3 Connect the other end of t...

Page 22: ...olator feeding the unit and the fan motors will start N B If you are intending to carry out work or maintenance inside the unit switch off the power at the mains outlet supplying the unit before you r...

Page 23: ...ning the unit Ensure that the system is installed according to the system designers intent incorporating any acoustic ducting that all joints are air tight ducting is well supported bends are avoided...

Page 24: ...to suit Figure 5 MON HRU Controls Summer Mode The unit is equipped with a Summer Mode for use when the indoor temperature is higher than desired and the outdoor temperature is lower than the indoor te...

Page 25: ...oost mode Press once again to exit Boost mode To activate Summer Mode press 3 times in less than three seconds after a short pause the green LED will illuminate and the supply fan will stop To exit Su...

Page 26: ...for 10 seconds 12 Monthly Maintenance Item Action Fan Filters Change the Fan Filters 1 Open the filter flaps and remove the 2 filters 2 Insert the replacement filters 3 Close the filter flaps 4 Reset...

Page 27: ...Appendix 27 PRODUCT FICHE For Residential Ventilation Units Complying Commission Delegated Regulation EU No 1254 2014...

Page 28: ...National Ventilation Stathe Road Burrowbridge Somerset TA7 0RY Website www nationalventilation co uk email info nvagroup co uk Sales and technical hotline 01823 690290 475018 E 1018...

Page 29: ...MON HRU 230 100 MON HRU 330 100 MON HRU 400 150 User Instructions PLEASE RETAIN THESE INSTRUCTIONS WITH THE PRODUCT...

Page 30: ...not attempt to remove the covers of this unit High Voltage is present in this unit NEW PROPERTY FILTER MAINTENANCE When fitted to a new build property the supply and exhaust filters should be checked...

Page 31: ...the Building Regulations document F 2010 The unit is designed for continuous 24 hour exhaust ventilation of stale moist air from bathrooms toilets and kitchens As the stale air is extracted a heat ex...

Page 32: ...20 240 V AC single phase 220 240 V AC single phase 220 240 V AC single phase AC Frequency Input 50 Hz nominal 50 Hz nominal 50 Hz nominal Rated Power 150 W max 160 W max 190 W max Physical Height excl...

Page 33: ...onitoring 5 Powering Up the Unit Switching On 1 Switch on the power at the mains supply isolator feeding the unit and the fan motors will start Switching Off 2 Turn the power off at the mains supply i...

Page 34: ...peration A label will have been applied by the person setting the flow rates during the commissioning process The label is applied to the area indicated by the printed corners and is intended to maint...

Page 35: ...Maintenance Item Action Fan Filters Change the Fan Filters 1 Open the filter flaps and remove the 2 filters 2 Insert the replacement filters 3 Close the filter flaps 4 Reset the LED press and hold th...

Page 36: ...National Ventilation Stathe Road Burrowbridge Somerset TA7 0RY Website www nationalventilation co uk email info nvagroup co uk Sales and technical hotline 01823 690290 475021C 0618...

Reviews: