Page 9
GENERAL OPERATION
HANDLE ADJUSTMENT
AFTER THE PROPER WHEEL ADJUSTMENT IS ACHIEVED, ADJUST HANDLE BY EITHER A OR B:
A. Removing handle adjustment pins, adjust handle to proper
angle and reinsert handle adjustment pins.
B. Lay machine on side, remove handle adjustment pins, adjust
handle to proper angle and reinsert handle adjustment pins.
No matter what the wheel angle is set at, the handle should be adjusted
to the "belt-line" of the operator or to what the operator is comfortable
with (See Figure A).
-
Low setting works best on soft sub floors, plywood, luan,
particleboard and wafer board.
-
Higher setting works best on direct glued down carpet, vinyl
or tile on concrete.
NOTE:
Adjustment by trail at the beginning of a job will give optimum performance.
MACHINE OPERATION
A well maintained machine is a productive machine. If not properly maintained, it could be unsafe and
could break down. A scheduled maintenance program should insure a long system life and a safe work
environment.
MACHINE START PROCEDURE
TO RUN MACHINE:
1. Machine MUST be off before plugging machine into power source.
2. Plug machine into extension cord and/or outlet.
3. Turn switch to on.
USER GENERAL INFORMATION
1. Always wear eye protection
2. Keep flammable and fragile objects away from this tool.
3. Always check nuts and bolt to make sure they are tight.
4. Always use the tool with proper voltage specified in the machines nameplate.
5. Do not operate around water or wet conditions without use of GFI on cord (stock #530 Circuit Guard).
6. Use properly grounded cord and receptacle.
7. Unplug from power before servicing or changing blades.
8. Use 12-3 or heavier wire cord, not exceeding 50 feet in length.
9. Do not force machine.
10. Do not alter machine.
11. Keep wheels free from debris.
Figure A