Flat head installed as example.
Figure 1
Figure 2
Figure 3
Figure 4
Ensure power is off before installation. Fix the screw position with
type-L screws fixed plate and fill with cement.
As shown in figure 1-2.
1.
Installation Guide
V1.0
Page 2-7
LED 5.5
“
Bollard
Place the flat washer and spring washer on the three type-L screws
and tighten with M10 hexagon nuts of M10*8.
4.
Remove M5*10 screws and reserve them, take the base from body
of fixture.
2.
Pass the input wire through the base and install the base to the
buried type-L screws.
3.
Asegúrese de que la energía esté apagada antes de la
instalación. Fijar la posición del tornillo con tornillos tipo L placa
fija y rellenar con cemento. Como se muestra en la figura 1-2.
Assurez-vous que l'alimentation est coupée avant l'installation.
Fixez la position de la vis avec des vis de type L plaque fixe et
remplissez de ciment. Comme le montre la figure 1-2.
Retire los tornillos M5*10 y resérvelos, saque la base del cuerpo
de la pilona.
Retirez les vis M5 * 10 et réservez-les, retirez la base du corps de
la borne.
Pase el cable de entrada a través de la base e instale la base con
los tornillos tipo L enterrados.
Passez le câble d'entrée à travers la base et installez la base avec
les vis enterrées de type L.
Empuje la arandela plana y la arandela elástica a través de los
tres tornillos tipo L y apriete con tuercas hexagonales M10.
Poussez la rondelle plate et la rondelle élastique à travers les
trois vis de type L et serrez avec des écrous hexagonaux M10.