Spray expanding foam, used to fill and seal the base of the bollard body.
Below instructions should be followed to minimize condensation of moisture on the inside of the lens
:
Installation Guide
V1.0
Page 5-7
LED 5.5
“
Bollard
Allow time for foam to expand, then visually inspect to confirm the
foam does not contain gaps between the foam and the conduit, or
the foam and the inside of the bollard body.
3.
Complete the bollard installation following all NEC and applicable
local Codes and Ordinances.
4.
Figure 3
Figure 4
Figure 1
TYPE 3 PLATE INSTALLATION
Remove M5*10 screws, take the bollard head from body.
1.
Flat head installed as example.
Permita que la espuma se expanda, luego inspeccione
visualmente para confirmar que la espuma no tenga espacios
entre la espuma y el conducto, o entre la espuma y el interior del
cuerpo del bolardo.
Laissez le temps à la mousse de se dilater, puis inspectez
visuellement pour confirmer que la mousse ne contient pas
d'espace entre la mousse et le conduit, ou entre la mousse et
l'intérieur du corps de la borne.
Complete la instalación del bolardo siguiendo todos los códigos y
ordenanzas locales aplicables y NEC.
Terminez l'installation de la borne en suivant tous les codes et
ordonnances NEC et locaux applicables.
Retire los tornillos M5*10, saque la cabeza del bolardo del cuerpo.
Retirez les vis M5 * 10, retirez la tête de la borne du corps.