EXCHANGING THE BIO BAG 

The Bio Bag will need to be changed on a regular basis.  The rate of filling will depend on the 
number of  users. When the bag becomes approximately 70% full,  you will need to replace it 
with a new Bio Bag by following these instructions.

 

Please ensure you wear protective glasses, face mask & gloves. 

 

1.

 

Identify an area that is suitable to empty the compost into a hole (

not within 100m of a 

potable water supply)

 on your property. Cover the top of the compost pile with at least 

100mm of soil or mulch. Alternatively, check with your local government if would allow you 
to mix the toilet compost with your general garden compost.

 

2.

 

Carefully lift the lid slightly, and then carefully disconnect the urine diversion by unclicking 
the connection (same as a garden hose) Cover the surface with 3

-

5cm of Wood Shavings. 

Now twist the Bio Bag closed, remove the bin and Bio Bag as one. This will help if the Bio 
Bag has already begun to break down. Bury the Bio Bag into the previously selected area 
and cover.

 

3.

 

Rinse bin if required, place a new Bio Bag in to the bin. To reduce the chance of soiling 
the bin, (in case the Bio Bag breaks down prematurely), cover the floor of the bin with 
some pine wood shavings or even use a conventional bin liner.

 

 

Now redo Step 5, Assembling the compost bin. And then you

re ready to go 

again.

 

 

Summary of Contents for Mini

Page 1: ... Thank you for purchasing the Mini Please read this manual carefully before installation Nature Loo is a brand of Ecoflo Wastewater Management Pty Ltd Visit our website at ecoflo com au IMNL 002 190704 Ecoflo Wastewater Management Pty Ltd ...

Page 2: ...Ltd Please call your local distributor or Ecoflo Wastewater Management for support if required Ecoflo Wastewater Management Pty Ltd www ecoflo com au www natureloo com au Phone 1300 138 182 Phone 07 3889 6144 Email info ecoflo com au Proudly Designed and Assembled in Australia by Ecoflo Wastewater Management ...

Page 3: ...he vent pipe liquid drain 6 Step 3 Constructing the liquid drain trench 9 Step 4 Powering the fan 10 Mains Power 10 Solar Power refer to Solar Panel Installation Manual 10 Step 5 Assembling the collection chamber 11 CARE MAINTENANCE 11 EXCHANGING THE BIO BAG 12 COMPOSTING ACCELERATORS 13 TROUBLE SHOOTING 14 PRODUCT COMPONENT WARRANTY 15 APPENDIX 1 16 Table of Content ...

Page 4: ...is height is very important for venting 2 x 100mm DWV PVC 45 degree bends The bends divert the vent pipe around the roof gutter awning Or 1x 100mm roof dektite Allows a water proof seal if the vent goes through the roof Brackets pipe clips to hold the vent pipe to the outside wall 2 or 3 depending on the height to the length of pipe 100mm slotted agricultural or drilled PVC pipe 2m Additional 19mm...

Page 5: ... E g The location of the toilet must have both 1 Easy access to connect the fan system to a permanent vent pipe up the outside of the structure The vent pipe from the toilet exits horizontally through the wall behind the toilet 2 An elevated starting point for liquid to flow by gravity from the toilet down into a liquid absorption trench which is to be dug outside the toilet room ...

Page 6: ...away from the wall Prepare to drill suitable holes to ac commodate the 19mm liquid drain hose and the 50mm PVC Pipe Use these pipes to accurately mark the diameters on the wall Wallace Grommet Liquid Drain Hole Hose removed Using the circles drawn on the wall as a guide cut a hole of sufficient size to allow the 50mm pipe to push through the wall and a second hole approximately 25mm for the liquid...

Page 7: ...Grommet 50mm PVC Pipe Insert the 50mm PVC pipe from the wall into the Shell through the Wallace Grommet and push Shell to its chosen position If the PVC pipe protrudes too far into the shell fouling the 20L bin mark trim the pipe to allow free air movement Shell Not supplied ...

Page 8: ...nstall the 100mm PVC pipe as per Option 1 or Option 2 pictured above If possible Option 1 is far better for ventilation as the two 45 degree elbows in Option 2 can slow the air flow Use pipe clips not provided to secure the 100mm pipe to the outside wall Once the toilet is permanently connected to the T piece you may attach the fibreglass toilet shell to the floor with the self tapping screws and ...

Page 9: ...ection side is resting just on the inside of the shell near the front edge The hose exiting through the hole in the shell should lead through the hole previously cut into the bathroom wall and out towards the absorption trench Wall Shell Liquid Drain Hose 50mm PVC Pipe Wallace Grommet Construct the excess liquid drain absorption trench as per the following diagrams Also note that the liquid drain ...

Page 10: ...d transformer is included to run the fan from mains power Connect the fans to the transformer as follows We recommend a spare fan is kept on hand at all times particularly after a year of use Go to Ecoflo Online Store or call 1300 138 182 for replacement or spare fans Solar Power refer to Solar Panel Installation Manual ...

Page 11: ...et Follow these instructions each time you change the Bio Bag CARE MAINTENANCE Urine Diversion Bowl After using the toilet you should spray Nature Flush Enzymes five times into the bowl to keep the liquid drain clear of crystallisation and odour Foreign Objects The system should not be used for the disposal of sanitary napkins or disposable diapers Cleaning the Shell and Seat Just like any other t...

Page 12: ...check with your local government if would allow you to mix the toilet compost with your general garden compost 2 Carefully lift the lid slightly and then carefully disconnect the urine diversion by unclicking the connection same as a garden hose Cover the surface with 3 5cm of Wood Shavings Now twist the Bio Bag closed remove the bin and Bio Bag as one This will help if the Bio Bag has already beg...

Page 13: ...valent of this on a daily or weekly basis The bulking agent can be added through the pedestal Refer to our website for suitable bulking agents We Do Not recommend the use of sawdust as it creates an anaerobic condition within the chamber Cypress cedar or eucalypt wood shavings due to their antimicrobial properties Nature Flush Enzymes A 125ml bottle of enzyme concentrate is supplied with the toile...

Page 14: ...ive the bin a quick wash and start again Please note that broken fans should be replaced immediately in order to avoid flies entering the system It is recommended that you keep a spare fan on hand at all times There is an unpleasant odour in the toilet room The power has failed resulting in toilet room odours Carefully follow the directions on how to empty your unit Check your fan is working corre...

Page 15: ...e manual or in any other printed instructions supplied with the system Labour and service charges incurred in the removal and replacement of any parts found defective under this warranty Items subject to a dispute where photographic evidence is inconclusive must be sent prepaid to Ecoflo The cost will be reimbursed by Ecoflo should the claim be found valid In addition to the above Ecoflo will only...

Page 16: ...IMNL 002 190704 Ecoflo Wastewater Management Pty Ltd Page 16 APPENDIX 1 ...