NX300 Installation Manual
Connecting transformer taps/load wiring
Page 4-4
Issue 3.0 2012-11-01
Figure 4.2: NX300 secondary wiring connections (power transformer cabinet)
X0
B
X0
B
A
C
A
A
C
X0
B
TO RACK 2
CROSS SECTION
TO RACK 3
C
CABLE TRAY
TO RACK 1
CABLE TRAY/
WIRING INTERFACE
Remove only the screws
securing the cover.
GND
(WT01)
X0
(WT02)
Cytolok
(JA92)
STATION REFERENCE GROUND
CONNECTION POINTS
Summary of Contents for NX300
Page 2: ......
Page 4: ......
Page 8: ...NX300 Installation Manual Page viii Issue 3 0 2012 11 01...
Page 22: ...NX300 Installation Manual Completing cabinet assembly Page 3 8 Issue 3 0 2012 11 01...
Page 40: ...NX300 Installation Manual Adjusting the spark gap Page 7 4 Issue 3 0 2012 11 01...
Page 46: ...NX300 Installation Manual Installing audio inputs Page 8 6 Issue 3 0 2012 11 01...
Page 58: ...NX300 Installation Manual Parts and tools Page 11 4 Issue 3 0 2012 11 01...
Page 69: ......