Installation Manual Chapter4. System Installation
©
Nautilus Hyosung, Inc.
All Rights Reserved
.
4-7
Hole Location for AC Cord & LAN Cable
▶
Hole Location for AC Cord & LAN Cable
Following figures show the location of leading-in hole for AC Cord and LAN Cable of
MX-7600DR.
Power Requirements
▶
Power Requirements
Power
Requirements
For MX-
7600DR with
CCIM
Operating
319W
(during
dispensing)
Stand-by
222W
Length of AC Cord
AC Cord
4500.0mm
[177.16inch]
AC Plug
350.0mm
[13.77inch]
Heater
Heat
Output
0.35 KW =
1195 BTU
(during
operation)
Leading-in hole of AC Cord
and LAN Cable
AC Cord & LAN Cord