Installation Check list 51
Connecting the Oil Supply
Yes
No
Is the fuel used Kerosene or Light-oil?
Did you use a galvanized pipe as the fuel line?
Did you install a fire valve?
If the oil line was installed with a single pipe, did the oil tank be installed more than
300 mm above the oil pump?
Did you check for leaks in oil supply piping?
Flue System
Yes
No
Have you flue the boiler in accordance with all local codes and the guidelines in this
manual?
Are the outlets and horizontal tubes of the flue sloping upwards (about 3 degrees)?
Are the air intake and flue connections on the lines correctly sealed?
Is the total flue length within the maximum length restriction?
Did you fix the flue system so that it does not fall out after installing the flue system?
Did you check for leaks in flue system?
Connecting the Power Supply
Yes
No
Is the supplied voltage 220-230 V AC?
Is the ground wire properly connected?
Operating the Boiler
Yes
No
Is the DIP switch on the controller PCB set for the model?
Have you given the Installation & Operation Manual to the owner for future reference?
Summary of Contents for LCB700-21LC