4 Contents
Contents
4.1.2 Front Panel DIP Switches
4.2 Measuring the Inlet Gas Pressure
4.4.1 Icons and Digital Display
4.4.3 Turning the Boiler On or Off
4.4.5 Adjusting the Temperature
4.4.7 Accessing Basic Menu Items
4.4.8 Accessing Advanced Menu Items
4.7 Key Component Descriptions
4.7.2 High Temperature Limit Switch
4.7.11 Secondary Heat Exchanger
5.2 Error Code List and Actions
5.3 Troubleshooting guide by symptom
5.3.3 Circuit breaker operation
6.2 Components Replacement Instructions
6.2.3 Fan Motor (Combustion Air)
7. Components Diagram and Part List
8. Inspection and Maintenance Schedule
Summary of Contents for NCB500-2S/37K
Page 3: ......
Page 4: ...Revisions 3 Version Description of changes Date 1 00 First issue September 7 2022 Revisions...
Page 115: ...Memo...
Page 116: ...Memo...
Page 117: ...Memo...
Page 118: ...Memo...