Qube 2 | Installation Manual
12
6 Testing
6.1 Check Correct Ignition Connection
Use a multi-meter to measure the voltage at the ignition line connected to the Qube 2.
Turn the key to the accessories position. Check that there is no voltage on the ignition line
Turn the key to the IGNITION position. Ensure that +12 / 24 V DC is present at ignition line
Watching the meter, start the vehicle and ensure that the voltage does remain ON during
starting
If any of these tests fail, the Qube 2 is not connected to the correct signal. Please fi nd the correct
wire.
6.2 Check Data and GPS
Ensure the vehicle is outside, so the GPS antenna has a clear view of the sky, and there is
good cellular coverage
Turn the Ignition Key on to the ignition position
Check that all 3 LED’s come ON. This may take up to 15 minutes, but is normally less than
2 minutes
1.
2.
3.
1.
2.
3.