Ready To Burn
Ready To Burn: Version 1.0 October 2015
Page
1
of
24
Dear Customer.
Thank you for purchasing the RTB pellet system. This product is designed and manufactured
to the highest standards by NBE Productions in Denmark.
We recommend that you read this manual before you install and use the product, so you get
the most out of your wood pellet system. In the event that you encounter any difficulties
while installing or using your product, we recommend that you first read the instruction
manual or the information contained in the support section on www.nbe.dk.
Note: There is help text on all menus in the Version 7 boiler control system and therefore
menus are not described in this manual. It is recommended to study the menus before initial
start-up.
Keep this manual so you always have it available if you ever need it.
•
Page 2:
Safety first
•
Page 3:
The Clean Air Act 1993 and Smoke Control Areas
•
Page 4-5:
Boiler specifications
•
Page 6:
Burner specifications
•
Page 7:
Boiler room design
•
Page 8:
Chimney design
•
Page 9:
Ventilation
•
Page 9-10:
Hydraulic system
•
Page 11:
Wiring diagram
•
Page 12:
Wiring diagram extension module
•
Page 13:
Electrical connection scheme
•
Page 14-15:
Internet connection
•
Page 16:
Cloud service
•
Page 17:
First time start up
•
Page 18:
Cleaning the burner & boiler
•
Page 19-20:
Trouble shooting
•
Page 21:
Preventing flue gas condensation
•
Page 22:
Warranty
•
Page 23:
EC declaration of conformity
•
Page 24:
Installation checklist
Summary of Contents for RTB 10
Page 1: ......