46
Document Number
DCV-00545
Date Released
Jul. 2020
Revision Number/Security level
R01 S2
Retrofit OPTIC 5 Touch+ InvencoLink Wayne Ovation (US & Canada)
Installation Guide
22. Gather any excess wire of EK0130 and tidy it into the loom. Use cable ties to tidy up the
installation. Excessive lengths should be bundled and tied so they stay inside the pump cabinet
frame.
23. For a double-sided installation (i.e., for Side B), please repeat Steps 1-5 and 7-22
24. Close and lock the pump door
a. Lift the latch lever to release the door.
b. Swing the door shut slowly ensuring that cables are not being pinched. If cables are
being pinched open the door and re-secure the cables before re-closing it.
c. Use the Ovation 1 door key to tighten the bolts at the top & bottom left corners of the door.
4.3.1 Wiring Completion
Ensure that all cables are tidy and cannot become snagged or pinched when the door of the cabinet is
opened and closed.
WARNING
– Local regulations may also require that the installation is electrically tested and
certified BEFORE switch-on.
Loosen nut
Tighten nut
EK0130