Confidential and proprietary information of NCR.
Unauthorized use, reproduction and/or distribution is strictly prohibited.
13
Routing the Tri-Light/Lane Light Cable on a Fixed
unit
To route the Terminal Display cables, follow these steps:
1. Do the following:
a. From the Tower Frame pole duct, route the Tri-Light/Lane Light cable
down through the built-in hooks inside the Tower Frame.
b. Route the cable down the Scanner Bucket floor. Use cable ties to
secure the cable on bridge lances.
c. Secure the cable to the anchor using a cable tie.