The terminal is fully assembled at the factory. This chapter explains the
mounting options and how to connect optional hardware components
to the terminal.
Installation Summary
The terminal should be removed from the shipping packaging and
visual checks made to verify the correct hardware configuration. The
system is then configured and any communication cables are
connected.
Only after inspection should the power cord be attached to the system
and then connected to the AC power source. Power-up self-tests will
run to verify basic functionality.
ROM-based setup should be used to configure network options. Full
configuration depends upon the system server and the management
web site.
Summary of Contents for 7401 Web Kiosk
Page 1: ...NCR 7401 Web Kiosk Release 2 3 Hardware User s Guide 16436 NCR B005 0000 1254 Issue D...
Page 80: ...Chapter 2 Hardware Installation 2 21 2 Remove the Core Module from the Fixed Angle Mount 16397...
Page 183: ...3 74 Chapter 3 Setup...
Page 263: ...Appendix B Feature Kits B 55 11 Route the cables in the Wall Bracket as shown below 17359...
Page 302: ...B 94 Appendix B Feature Kits 17729 Pole Mount Wall Mount...
Page 326: ...B 118 Appendix B Feature Kits 2 Insert the end of the paper into the Paper Guide 16731...
Page 328: ...B 120 Appendix B Feature Kits 4 Remove the cut paper waste from the Presenter 16965...
Page 334: ...B 126 Appendix B Feature Kits 19050...
Page 367: ...Index 159...
Page 368: ...B005 0000 1254 September 2001 Printed on recycled paper...