MSL-200
CNC LATHE
MAINTENANCE MANUAL
NCT Ipari Elektronikai Kft.
21 / 32
10 September 2018
H-1148 Budapest, Fogarasi út 7.
Phone: +36 1 467 6300
www.nct.hu
4.
Place the machine on the plate, and insert L-shape foundation bolts from bottom to top
through the flat plate, level adjusting block and adjust bolts, fixing washers and nuts.
Check precision level of the machine, and tighten check nuts and fasten level adjusting
bolts.
5.
Gout concrete in the foundation bolt channels, making sure the concrete surface is on the
same level as the foundation concrete. Wait seven to ten days until the concrete has com-
pletely set, then you may calibrate the level precision of the machine.
Foundation layout plan