ICON

MEANING AND FUNCTIONS
Shuts off the screen. If the screen is off, just click on any part of it to turn it 
back on.
It allows you to decrease the value of the parameter in use.

It allows you to increase the value of the parameter in use.

When displayed, it indicates that the 

3Lion

 battery is charging. If the icon 

does not become red then charging comes from a source other than the 

alternator (such as solar panels, network chargers, etc.). 
Indicates that the alternator is not charging the

 

3Lion

 

battery

 

.

 

Indicates that the alternator is charging the

 

3Lion

 

battery

 

.

Enables you to advance the system parameter setting sequence and/or to 
confirm your choices.

Allows you to return to the previous step of the system parameter setting 
sequence.

Allows you to change system settings. If you press it briefly, you can set the 
display mode. If you press it for a long time, you can set the date, time, the 
Ah of the

 

3Lion

, language. 

In order to preserve battery from discharging, after 2 minutes of inactivity the display will
decrease its brightness. After 15 minutes, it will shut off. Just touch it to turn it on and
resume normal use.
The   system   is   protected   against   excessive   discharge   or   overload,   however,   it   is
recommended that the battery voltage does not fall below 10.5V and does not exceed 15V.
If the

 

3Lion

 

voltage

 

is less than 11.5V, charge the battery immediately.

Before   storing   the

 

3Lion

,   it   is   recommended   that   you   turn   off   the   display.   It   is   also

recommended to leave the battery fully charged. If the 

3Lion

 is not used for a long time,

even if the self-discharge is very low (less than 3%/month), it is advisable to check at least
once every two months that the remaining amount of charge is greater than 90% and that
the voltage is greater than 12.8V. Otherwise, fully charge the battery. 

Summary of Contents for 3Lion 3L-100

Page 1: ...All the energy you need www ndsenergy it e mail commer ndsenergy it EN 2...

Page 2: ...n 3Link 2 SAFETY 3 INTRODUCTION 4 INSTALLATION 4 1 3Link INSTALLATION 4 2 MOUNTING SCHEME 4 3 DISPLAY INSTALLATION 5 OPERATION 5 1 CHARGE 5 2 DISCHARGE 6 OPERATION CHECK 7 VERIFIABLE PROBLEMS 8 TECHNI...

Page 3: ...h warm water and seek medical advice immediately Be careful when installing so that the two poles of the 3Lion do not come in contact with each other Use isolated equipment and do not place and or lea...

Page 4: ...tional lead batteries AGM GEL Free Acid For example it can withstand high charging currents with a very high efficiency or very low current dissipated during that phase which implies a much better cha...

Page 5: ...battery is disconnected from the system Prepare an area for housing the 3Link box as close as possible to the 3Lion and to the engine battery but never in the engine compartment or in compartments tha...

Page 6: ...the engine battery and thus the alternator to the service battery when the vehicle has the engine switched on i e the alternator is in operation and signal D is active Below is a representation The in...

Page 7: ...and 3 of the 3Link it is strongly recommended that you use the terminals for M8 screws DO NOT use the fork type to ensure a perfect and secure connection between the cable and the contact of the 3link...

Page 8: ...vehicle If not present it is recommended to use cables with a section greater than or equal to 10mm 2 Connection 07 can be done with cable the cross section of which is between 1mm 2 and 2 5mm 2 As so...

Page 9: ...7 2 mm are to be made 3 Drill the holes and screw the back cover to the wall using the supplied screws Be careful that once tightened the screws do not protrude beyond the countersinks 4 Pass the comm...

Page 10: ...us pens for a more accurate touch on the display but it is important that they do not have a sharp tip which can damage the surface 5 OPERATION The 3Lion 3Link system allows for the automatic manageme...

Page 11: ...S Setting the language Click on the desired flag and then on the arrow to confirm your choice Setting the language Click on the desired flag and then on the arrow to confirm your choice Setting the ca...

Page 12: ...for at least 3 seconds the Setting key Once the key has been pressed the main screen appears as shown below The state of charge or SOC indication as soon as the system is installed is purely indicati...

Page 13: ...es that is battery charging In the latter case the thunderbolt symbol is displayed overlapping the notches of the battery You can keep this view active by clicking on the Setting button and then check...

Page 14: ...it briefly you can set the display mode If you press it for a long time you can set the date time the Ah of the 3Lion language In order to preserve battery from discharging after 2 minutes of inactiv...

Page 15: ...acid batteries 52 DISCHARGE Only for models 3L 100 3L 100B Do not connect equipment with power consumption greater than 100A However this limit may be exceeded provided that the following limits are m...

Page 16: ...n on the display it indicates that the 3Lion battery is charging and in this case skip to step 5 5 If the 3Lion battery is not fully charged and if the check in step 4 has been successful check the di...

Page 17: ...f the amount of available charge SOC does not seem to be accurate or has suddenly indicated a value of less than 5 Run a full charge of 3Lion where full charge means 100 shown on the battery state of...

Page 18: ...of cycles estimated 80 DOD 2500 2500 2500 2500 Operating temperature 20 C 60 C 20 C 60 C 20 C 60 C 20 C 60 C Storage temperature 20 C 60 C 20 C 60 C 20 C 60 C 20 C 60 C Self discharge 3 month 3 month...

Page 19: ...Battery tolerance voltage Engine battery 3Lion 5 Dimensions 125x123x46mm Weight 480g 3link box display dimensions 175x135h67mm Box weight including display and accessories 785g Technical characterist...

Page 20: ...together with the warranty card the customer receives this certificate to be filled out in every part by the seller The warranty certificate must be kept and filed for each dispute Failure to submit...

Page 21: ......

Page 22: ...ize the processing of my personal data under the Decree Law June 30 2003 N 196 customer s signature To be returned in enclosed envelope to NDS Energy s r l Via G Pascoli 169 65010 Cappelle sul Tavo Pe...

Reviews: