4.
INSTALLATION
To properly install the device, follow the instructions below.
4.1
INSTALLATION OF
3
Link
The
3Lion-3Link
system offers maximum performance if supported by a suitable
capacity alternator. It is recommended that the alternator be greater than or equal to
120A with an no-load voltage between 13.8V and 14.7V
. No-load measurement means
the voltage measured at the terminals of the engine battery, when the engine is on, the
engine battery is charged or partially charged when all the electrical equipment on
the vehicle is off (lights, conditioner, etc.) and when the services battery is
disconnected from the system.
Prepare an area for housing the
3Link
box
,
as close as possible to the
3Lion
, and to the
engine battery, but never in the engine compartment or in compartments that are not
protected from atmospheric agents
. Remove the two screws in the front (highlighted in red
in the following figure), lift the cover and pull it out to allow convenient access to the
connection points.
Attach the base of the
3Link
to a wall or floor of the housing selected for installation; use
the 4 self-tapping screws in the appropriate holes on the bottom of the base (highlighted in
yellow in the following figure).
4.2 MOUNTING SCHEME:
Before installing, make sure the vehicle engine and the battery charger are off. Do not
make junctions on the cables, make direct connections.