9-4
PREPARING FOR INSTALLATION AND REMOVAL
Follow the procedure below to prepare for installing or removing components.
1.
Shut down the operating system.
2.
Press the POWER switch to power off the server (the POWER/SLEEP lamp goes off).
3.
Unplug the power cord from the AC inlet on the server
The AC Standby lamp on the front of the server goes off.
4.
Remove all the cables connected to the server on the rear panel.
5.
Make a clearance of 1m to 2m in the front and rear sides and left and right sides of the server.
NOTE:
Make sure to disconnect the power cord from the outlet before installing or
removing the option devices. If you remove the internal cable with the power cord being
connected, the STATUS lamp will light in amber when the server is powered. Disconnect
the power cord, connect it again, and then restart the server.
Summary of Contents for 140He
Page 1: ...User s Guide Express5800 140He...
Page 2: ......
Page 4: ...This page is intentionally left blank...
Page 60: ...2 32 This page is intentionally left blank...
Page 170: ...5 20 This page is intentionally left blank...
Page 328: ...B 6 This page is intentionally left blank...
Page 342: ...D 10 This page is intentionally left blank...
Page 354: ...E 12 This page is left intentionally blank...
Page 359: ......
Page 360: ......