5-82 Installing and Using Utilities
Overview
Active Upgrade™ technology allows you to upgrade system and application software on an NEC
Express5800/ft series system with minimal downtime.
Instead of taking your system offline to run upgrade procedures, you can use Active Upgrade
technology to split the system into two independently running systems, one “side” of which you
upgrade while the other “side” continues to run your applications without interruption.
To learn more about Active Upgrade technology, see the following topics:
•
“Features” on this page.
•
“Active Upgrade Process” on page 5-83
Features
Active Upgrade technology enables the following:
•
Install software updates with minimal disruption to your critical applications.
The applications required for the server operation continue to run on one side of the system while
you install software on, and even restart, the other side. There is only a brief disruption when you
are finished installing updates, as your critical applications are restarted on the upgraded software.
•
Test the latest software updates in your environment
before
making the updates permanent.
After your critical applications are restarted on the upgraded software, you can verify the success of
your software updates in a production environment, with real users and system load. If you want to
keep the changes, there is no additional downtime. Otherwise, as quickly as your system can restart,
you can abort the upgrade to go back to the original version of your software.
•
Abort the upgrade process at any point up until you commit the changes.
If, for any reason, you are not satisfied with an upgrade, you can abort the upgrade session to return
the system to its original state. Nothing is permanent until you choose to commit the changes. (Also,
there might be no disruption to your critical applications if you abandon the upgrade early in the
upgrade process, before testing the software in your production environment).
TIPS:
Active Upgrade Process, page 5-83
Software Upgrade Support, page 5-90
Prerequisites, page 5-92
Summary of Contents for EXP320J
Page 12: ... THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 25: ...xiii APPENDIX A SPECIFICATIONS A 1 APPENDIX B I O PORT ADDRESSES B 1 ...
Page 26: ...xiv THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Page 28: ...1 2 Precautions for Use 使用上的注意 本章包含著對服務器恰當安全的操作必要的信息 ...
Page 54: ...1 28 Precautions for Use This page is intentionally left blank ...
Page 64: ...2 10 General Description Rear View ...
Page 68: ...2 14 General Description CPU IO Module CPU IO module ...
Page 88: ...2 34 General Description This page is intentionally left blank ...
Page 100: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled ...
Page 218: ...4 92 System Configuration This page is intentionally left blank ...
Page 390: ...5 172 Installing and Using Utilities This page is intentionally left blank ...
Page 408: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1 ...
Page 410: ...6 20 Maintenance This page is intentionally left blank ...
Page 454: ...7 44 Troubleshooting This page is intentionally left blank ...
Page 485: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035 ...
Page 500: ......
Page 503: ......