1. Power-on of Blade Server
Express5800/B120f User's Guide
82
Chapter 3 Setup
1.2
Power ON from Network Serial Port
Depending on the BIOS setting of the CPU blade, the power of the CPU blade may be automatically turned on
by a proper packet received from the network.
This power-on procedure can be specified by setting
Wake On Events
of
System Hardware
in the BIOS
SETUP Utility.
1.3
Power ON from Remote Console
The power of the CPU blade can be turned on by using remote control feature of EXPRESSSCOPE Engine 3
(BMC).
1.4
Operation after Power ON
If the CPU blade is connected with a display unit, the NEC logo appears on the screen of the display unit after a
while from the power-on.
Important Do not power off the server until NEC logo and some messages appear.
While the NEC logo appears, the CPU blade runs the self-diagnosis program (POST) to diagnose the CPU
blade itself. Refer to
Chapter 3 (1.5 POST