67
Setup of Server
Setup the sever in the following procedure
1. Install the rack
Refer to chapter 2
“Hardware”
-
“Install the rack”.
2. Install the optional units (If you bout separately)
Refer to chapter 2
“Hardware”
-
“Installing/Removing optional parts/”.
3
.
Install the server in the rack
Refer to chapter 2
“Hardware”
-
“Mounting/Unmounting the server to/from Rack”.
4
.
Connect peripheral devices such as display unit, keyboard, network devices to the
server.
Refer to chapter 2
“Hardware”
-
“Connection”.
5
.
Connect the power cord to the server and the PDU, then turn the AC power on.
Refer to chapter 2
“Hardware”
-
“Power Code Connection”.
6
.
Configure the management LAN port on the server using the menu system of
EXPRESSSCOPE® Monitor.
Refer to chapter 2
“Hardware”
-
“NEC EXPRESSSCOPE® Monitor”.
7
.
Connect the LAN cable to the management LAN port.
Refer to chapter 2
“Hardware”
-
“Connection”.
IMPORTANT :
Do not connect the LAN cable to the management LAN port.
Connect LAN cable after the management LAN port has been
configured.
Summary of Contents for Express 5800
Page 73: ...73 Memo ...
Page 279: ...Hardware 279 3 BIOS Menu screen is displayed ...
Page 339: ...Hardware 339 3 BIOS will start Select Save Exit then press Enter ...
Page 444: ...444 Part Number Part number FRU File ID FRU file ID Asset Tag Asset management tag ...
Page 573: ...573 Memo ...
Page 583: ...Software 583 Memo ...
Page 690: ...Operation and Maintenance 690 Memo ...
Page 719: ...XXIX Memo ...