Upgrading Your Server 9-37
11.
After the insertion, press the riser card down with your fingers until it is fully seated.
12.
Install the components you removed previously.
13.
Verify that POST displays no error messages.
If POST displays an error message, take a note on the message and see the POST error
messages listed in Chapter 8.
14.
Select "Yes" for [Advanced]
→
[Reset Configuration Data].
This setting is required to change the hardware configuration data. See Chapter 4 for
details.
15.
Start the BIOS configuration utility in the installed card, and set up the card.
Presence/absence of the utility and the start and operation methods depend on the card.
For details, see the manual provided with the card.
Removal
Remove a PCI board in reverse order of the installation steps.
Summary of Contents for Express5800/120Rh-2
Page 142: ...4 46 Configuring Your Server This page is intentionally left blank ...
Page 236: ...7 12 Maintenance This page is intentionally left blank ...
Page 320: ...9 46 Upgrading Your Server Pin Red Pin Red N8103 80F N8103 81F ...
Page 336: ...9 62 Upgrading Your Server This page is intentionally left blank ...
Page 338: ...A 2 Specifications This page is intentionally left blank ...
Page 346: ...C 2 IRQ This page is intentionally left blank ...
Page 406: ...G 4 Product Configuration Record Table This page is intentionally left blank ...