Upgrading Your Server 9-59
Installation
Follow these steps to replace the RMC with an optional Advanced Remote Management card
(ARMC).
1.
See section "Preparing for Installation and Removal" described earlier to prepare.
2.
Pull out the server from the rack.
3.
Open the logic cover.
4.
Assemble the management network card that attached to the ARMC and install the card to
the riser card.
5.
Connect the internal cable provided with ARMC to ARMC and the management network
card as shown in the figure below.
The following figure shows the cable routing of the internal cable.
6.
Reassemble the server.
7.
Turn on the server and check that the no error messages other than the following message
are displayed on the POST screen.
H/W Configuration of BMC is corrupted.
!!Update BMC H/W Configuration by configuration tool!!
!!Refer to BMC configuration manual!!
See Chapter 8 for POST error messages.
8.
Insert the NEC EXPRESSBUILDER CD-ROM into the CD-ROM drive and reboot the
server.
Summary of Contents for Express5800/120Rh-2
Page 142: ...4 46 Configuring Your Server This page is intentionally left blank ...
Page 236: ...7 12 Maintenance This page is intentionally left blank ...
Page 320: ...9 46 Upgrading Your Server Pin Red Pin Red N8103 80F N8103 81F ...
Page 336: ...9 62 Upgrading Your Server This page is intentionally left blank ...
Page 338: ...A 2 Specifications This page is intentionally left blank ...
Page 346: ...C 2 IRQ This page is intentionally left blank ...
Page 406: ...G 4 Product Configuration Record Table This page is intentionally left blank ...