3-12 Setting Up Your Server
2.
At least two persons are required to install the server. Securely hold the server and
install it in the rack.
Firmly fit the inner rails on the sides of the server into the rail assemblies that are installed
on the rack, and then slowly push the server into the rack.
If the server is locked on its way into the rack, slowly push it in while pressing the release
levers on the right and left sides of the server.
When the server is installed for the first time, the mechanical parts are rather hard to slide.
You may feel strong friction when pushing in the server. In this case, strongly push it in.
3.
Confirm that the sliding rails work normally by pulling the server out of the rack and
pushing it in several times.
NOTE:
Confirm that the sliding rails work normally. If the sliding
rails are stuck to the rack frame and do not come out, reinstall them.
Release lever
Summary of Contents for Express5800/120Rh-2
Page 142: ...4 46 Configuring Your Server This page is intentionally left blank ...
Page 236: ...7 12 Maintenance This page is intentionally left blank ...
Page 320: ...9 46 Upgrading Your Server Pin Red Pin Red N8103 80F N8103 81F ...
Page 336: ...9 62 Upgrading Your Server This page is intentionally left blank ...
Page 338: ...A 2 Specifications This page is intentionally left blank ...
Page 346: ...C 2 IRQ This page is intentionally left blank ...
Page 406: ...G 4 Product Configuration Record Table This page is intentionally left blank ...