Setting Up Your Server 3-15
4.
Loosen the two captive thumbscrews.
5.
Hold the handle and pull out the server from the rack slowly and carefully.
The server clicks to be latched.
Captive thumbscrews
0
1
2
3
4
5
6.
Pull out the server from the rack with the right and left release lever pressed to release the
latch.
IMPORTANT:
Pull out the server slowly holding the bottom of the server by at
least two persons.
Do not apply any load on the server pulled out from the rack. Doing
so may cause personal injury if the server drops.
To remove some mechanical parts of the rack, see the installation procedure.
Handles
Release lever
Summary of Contents for Express5800/120Ri-2
Page 16: ...x This page is intentionally left blank ...
Page 19: ...Notes on Using Your Server 1 3 Internal View ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 68: ...2 34 General Description This page is intentionally left blank ...
Page 157: ...Installing the Operating System with Express Setup 5 29 This page is intentionally left blank ...
Page 193: ...7 12 Maintenance This page is intentionally left blank ...
Page 303: ...C 2 IRQ This page is intentionally left blank ...
Page 323: ...D 20 Installing Windows Server 2003 x64 Editions This page is intentionally left blank ...
Page 349: ...F 4 Product Configuration Record Table This page is intentionally left blank ...