Setting Up Your Server 3-19
To connect the power cord from the server to an uninterruptive power supply (UPS), use service
outlets on the rear of the UPS. Refer to the manual that comes with the UPS.
When the power cord from the server to a UPS, change the BIOS setup of the server to link with
power supply from the UPS.
To power on the server from the UPS (Uninterruptible Power Supply), select [Server] - [AC-LINK]
- [Power On].
Change a parameter for "AC-LINK" under the Server menu of the BIOS SETUP utility. See Chapter
4 for details.
Summary of Contents for Express5800/120Ri-2
Page 16: ...x This page is intentionally left blank ...
Page 19: ...Notes on Using Your Server 1 3 Internal View ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 68: ...2 34 General Description This page is intentionally left blank ...
Page 157: ...Installing the Operating System with Express Setup 5 29 This page is intentionally left blank ...
Page 193: ...7 12 Maintenance This page is intentionally left blank ...
Page 303: ...C 2 IRQ This page is intentionally left blank ...
Page 323: ...D 20 Installing Windows Server 2003 x64 Editions This page is intentionally left blank ...
Page 349: ...F 4 Product Configuration Record Table This page is intentionally left blank ...