G-22
STEP 2
MOUNTING SERVER ON RACK
1.
Lift the server to the height at which the slide rails are installed on the rack by at least four persons (or using a
lift).
2.
Engage the inner rails installed on the sides of the server with the slide rails. Then insert the server into the
rack.
When the servers are latched on the way, push the right and left release levers to release the lock. Insert the
server to the rack further.
Mating portion
Release lever
Bearing rail
Slide rail assembly
Plastic portions
Inner rail
Summary of Contents for Express5800 140He
Page 1: ... User s Guide Express5800 140He ...
Page 2: ......
Page 4: ...This page is intentionally left blank ...
Page 18: ...x This page is intentionally left blank ...
Page 62: ...2 32 This page is intentionally left blank ...
Page 266: ...8 56 This page is intentionally left blank ...
Page 336: ...B 6 This page is intentionally left blank ...
Page 362: ...E 12 This page is left intentionally blank ...
Page 378: ...G 12 ...
Page 397: ......
Page 398: ... ...