G-23
3.
To make sure that the server is mounted on the rack securely, hold the handles on the front of the server to pull
out or insert the server into the rack several times.
IMPORTANT:
Push each release lever using a screwdriver or a similar tool. Pushing a
release lever with your fingers may cause the fingers to be caught and thus injured.
While the server is pushed into the rack, it may not be pushed further due to some lock.
This is because the lock lever disables the server to be pushed into the rack. Make the lock
lever level to release the lock. Then push the server slowly into the rack with keeping the
release of the lock.
Summary of Contents for Express5800 140He
Page 1: ... User s Guide Express5800 140He ...
Page 2: ......
Page 4: ...This page is intentionally left blank ...
Page 18: ...x This page is intentionally left blank ...
Page 62: ...2 32 This page is intentionally left blank ...
Page 266: ...8 56 This page is intentionally left blank ...
Page 336: ...B 6 This page is intentionally left blank ...
Page 362: ...E 12 This page is left intentionally blank ...
Page 378: ...G 12 ...
Page 397: ......
Page 398: ... ...