-
108
-
4.10.8
Replacement of SCSI-BP(5HDD) on 140HE Chassis
Notes:
To replace the SCSI-BP, first remove all the HDDs from the Server.
Before the replacement, always back up the RAID configuration information.
After the replacement of the SCSI-BP, insert the HDDs into the original slots without changing the
installation positions.
Before removing the PCI board, note the installation position and put a label indicating the
installation position on the PCI board.
1.
Do steps 1 to 6 described in Subsection 4.10.7 above.
Remove all the HDDs instead of removing the HDDs only in the additional HDD cage.
2.
Remove the CD-ROM and front panel modules from the Server.
Remove any backup devices if installed.
IMPORTANT:
Always disconnect the FD cable from the
FD drive before pulling out the CD-ROM module installed
in the Server on the 140He chassis. If not, the FD cable will
be broken.
3.
Remove the screws (2) fixing the fan cover to remove it.
And remove the screws (2) fixing the logic cover and slide the cover to the rear direction
to remove it.
4.
Remove the screws (2) fixing the front tower frame and slide the frame outward with it
lifted to remove the front tower frame from the Server.
Fixing screw (×2)
Device Cage
Summary of Contents for EXPRESS5800/140He
Page 1: ...Nec coF S e r v i c e G u i d e EXPRESS5800 140He EXPRESS5800 140Rd 4 ...
Page 2: ...This page is intentionally left blank ...
Page 4: ...This page is intentionally left blank ...
Page 144: ... 128 8 2 3 Processor and VRM Processor 1 Processor 2 Processor 4 Processor 3 ...
Page 153: ... 137 voltage drop and the system is restarted This is not an error ...
Page 161: ... 145 No Error message Action 8 The firmware is erased unsuccessfully ...
Page 163: ... 147 ...
Page 181: ... 165 12 3 Block Diagram ...
Page 182: ... 166 This page is intentionally left blank ...
Page 183: ... 167 This page is intentionally left blank ...
Page 184: ... 168 ...