-
67
-
4.6 Dump
Acquisition
The dump can be acquired by pressing the dump switch on the front of the Server. The destination
of the dump is the boot device. Note that the dump may not be acquired due to OS setting.
NOTE:
If the dump switch is pressed once, it will be
masked until the DC power is turned off. Thus, always turn
off the DC power after dump acquisition.
4.7 POST
Execution
The POST is executed at the power-on or reset operation. If an error occurs, the relevant error
message appears on the display. See Chapter 8 for the error messages.
4.8 TeDoLi
Execution
Insert the attached EXPRESSBUILDER in the CD-ROM drive to start it and select the system
diagnosis from the menu to start TeDoLi. Then perform proper operations following the menus
appearing on the display.
NOTE:
Always disconnect the LAN cable from the Server
before executing the system diagnosis because it may have
bad influences on the network.
Summary of Contents for EXPRESS5800/140He
Page 1: ...Nec coF S e r v i c e G u i d e EXPRESS5800 140He EXPRESS5800 140Rd 4 ...
Page 2: ...This page is intentionally left blank ...
Page 4: ...This page is intentionally left blank ...
Page 144: ... 128 8 2 3 Processor and VRM Processor 1 Processor 2 Processor 4 Processor 3 ...
Page 153: ... 137 voltage drop and the system is restarted This is not an error ...
Page 161: ... 145 No Error message Action 8 The firmware is erased unsuccessfully ...
Page 163: ... 147 ...
Page 181: ... 165 12 3 Block Diagram ...
Page 182: ... 166 This page is intentionally left blank ...
Page 183: ... 167 This page is intentionally left blank ...
Page 184: ... 168 ...