Setting Up the System 2-9
A
– M5 Cagenuts for Cable Retention Arm
B
– Rack Mounting Rail Assembly
Alignment Tabs
C
– Rack Mounting Rail Assembly
M5 Screw Holes
Figure 2-4. Locating and Marking the Rear Mounting Holes for the Server
3.
While marking the hole locations for the Rack Mounting Rail Assemblies,
also mark the locations on the front vertical mounting rails for the cage nuts,
which hold the screws of the server faceplate (see Figure 2-3) and the Cable
Retention Arm (see Figure 2-4).
4.
Insert four M5 cage nuts in their marked locations on the front vertical
mounting rails (see Figure 2-5), as follows:
!
Position the cage nut on the inside of the front vertical mounting rails.
!
Hook the side lip of a cage nut into the square hole in the rail.
!
Push the other side lip of the cage nut into the square hole in the rail
until it is secured.
!
Repeat for each cage nut.
Summary of Contents for Express5800/180Rb-7
Page 1: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Page 2: ...xxx ...
Page 3: ... U s e r s G u i d e EXPRESS5800 180Rb 7 ...
Page 10: ...viii Contents ...
Page 58: ...2 24 Setting Up the System ...
Page 146: ...4 40 Upgrading Your System ...
Page 166: ...5 20 Problem Solving ...
Page 186: ...10 Glossary ...
Page 190: ...4 Equipment Log ...
Page 195: ...xx ...
Page 196: ... 456 01564 001 ...