5-124 Installing and Using Utilities
To configure a custom action
1.
On the Custom Actions page, do one of the following:
•
Next to
File
, type the full path name and file name of the executable you want to run.
The file must already exist on the system.
Example: C:\bin\mybatchfile.bat
•
Click
Browse
to locate the executable using a file browser. Click the file name in
the file browser, and click Open to select the file.
2.
Next to
Arguments
, type any arguments that you need to run with your executable.
No arguments are required; however, see “Programming Notes for Custom Actions” on page
5-126 for information about passing optional Active Upgrade environment variables to your
executable.
3.
In the drop-down list for
Control type
, select the option that best describes when the Active
Upgrade Console will execute your custom action, as discussed in the below table.
Control Types for Custom Actions
Control Type
Purpose
Start Application
Executes the custom action whenever the Active Upgrade Console needs
to start applications. For example, the console needs to restart
applications on the Upgrade Side when you merge the system.
Stop Application
Executes the custom action whenever the Active Upgrade Console needs
to stop applications. For example, the console needs to stop applications
on the Upgrade Side when you split the system. It also stops applications
on the Production Side when you merge the system.
Readiness Check
Executes the custom action once during the readiness check, before you
initiate the Active Upgrade process. This control type allows you to build
your own verifications into the readiness check.
Summary of Contents for Express5800/320Fd-MR
Page 13: ...v Appendix B I O Port Addresses This appendix lists factory assigned I O port addresses...
Page 19: ...xi THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 43: ...2 10 General Description Rear View...
Page 47: ...2 14 General Description CPU IO Module CPU IO module...
Page 67: ...2 34 General Description This page is intentionally left blank...
Page 79: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled...
Page 106: ...Windows Setup and Operation 3 39 This page is intentionally left blank...
Page 198: ...4 92 System Configuration This page is intentionally left blank...
Page 370: ......
Page 371: ...This page is intentionally left blank...
Page 389: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1...
Page 391: ...6 20 Maintenance This page is intentionally left blank...
Page 465: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035...
Page 480: ......
Page 483: ......