Installing and Using Utilities 5-91
9.
Right-clicking the server
name to open the pop-up
menu and select [Open
Remote Console] to open
[MWA Remote Console].
10.
Select the [Action at Remote
Console Connect] command
from the popup menu displayed by right-clicking the server window to display the [Action
at Remote Console Connect] dialog box. Then select [Go MWA mode].
11.
Insert NEC EXPRESSBUILDER CD-ROM into the drive of the computer to be managed
and insert floppy disk storing the configuration information (CSL_LESS.CFG) into the
FDD drive.
12.
Hook up the management PC to LAN.
13.
Power off and on the main unit to reboot the system.
After one reboot, the main menu will appear on the management PC’s screen, on which
you can perform hardware setup and run utilities.
TIPS:
If the configuration information (CSL_LESS.CFG) in the FD
has already been loaded, the main menu will appear without a reboot.
14.
When the main menu appears on the management PC’s screen, eject the floppy disk.
15.
If you use other tools, exit NEC EXPRESSBUILDER and power on/off the main unit.
IMPORTANT:
After completing the procedure for remote console
connection, uncheck [Reset] of [Activate] in [Property] dialog box.
Summary of Contents for Express5800/320Lb FT Linux
Page 10: ...iv This page is intentionally left blank ...
Page 16: ...x This page is intentionally left blank ...
Page 19: ...Precautions for Use 1 3 Label A Label B Label C Label E Label D ...
Page 20: ...1 4 Precautions for Use Rack mount model Label B Label A Label C Label D ...
Page 21: ...Precautions for Use 1 5 Label D Label C Label B Label A ...
Page 22: ...1 6 Precautions for Use PCI CPU Modules PCI Module CPU Module Label A Label A Label A ...
Page 36: ...1 20 Precautions for Use This page is intentionally left blank ...
Page 44: ...2 8 General Description Front View inside Tower model Rack mount model ...
Page 70: ...2 34 General Description This page is intentionally left blank ...
Page 118: ...3 48 Setup This page is intentionally left blank ...
Page 162: ...4 44 System Configuration This page is intentionally left blank ...
Page 294: ...6 14 Maintenance This page is intentionally left blank ...
Page 336: ...7 42 Troubleshooting This page is intentionally left blank ...
Page 355: ...System Upgrade 8 19 15 Check the disk you selected and click Next 16 Click Complete ...
Page 399: ...System Upgrade 8 63 Cable ties included with cabinet ...
Page 410: ...8 74 System Upgrade This page is intentionally left blank ...
Page 412: ...A 2 Specifications This page is intentionally left blank ...