1. Turning on the Server
Express5800/GT110d-S User’s Guide
125
Chapter 3 Setup
1.
Turning on the Server
Turn on the server by using the following procedure.
Important Wait for approximately 10 seconds before turning on the server again after
the power has been turned off.
1. Disconnect Flash FDD if applicable.
2. Turn on the peripheral devices that connect to the display monitor and the server.
Note
If the power cord is connected to power control system such as an Uninterruptible
Power Supply (UPS), make sure that the power control system is turned on.
3. Press the POWER switch at the front of the server.
The POWER LED is turned on green and after a while,
the NEC logo appears on the display. While the NEC logo
is being displayed, the self-diagnostic program (POST)
runs and diagnoses the hardware. For details, refer to
Chapter 3 (
1.1 POST
).
POWER
LED
POWER
switch