2. Installation and Connection
Express5800/R310g-E4, R320g-E4, R320g-M4 User's Guide
43
Chapter 2 Preparations
2.2.2
Installing the server to the rack
Mount the server to the rack.
WARNING
Be sure to observe the following precautions to use the server safety. Failure to
observe the precautions may cause death or serious injury. For details, see
Safety Precautions and Regulatory Notices
.
Do not use any racks out of standards.
Use only under the specified environment.
CAUTION
Be sure to observe the following precautions to use the server safely. Failure to
observe the precautions may cause burns, injury, and property damage. For
details, see
Safety Precautions and Regulatory Notices.
Do not drop the server.
4U chassis weighs about 15 kgs. At least two persons are required to install
it.
CPU/IO module weighs about 18 kgs. At least two persons are required to
install it.
Do not leave the CPU/IO module of the server being pulled out.
Do not install the CPU/IO module with its cover removed.
Do not get your fingers caught.
Important Temperature increases and airflow in the rack
If multiple devices are installed, or if the inside of the rack is not sufficiently
ventilated, the internal temperature rises due to the heat emitted from each
device, which may result in a malfunction. Review airflow in the rack and room
and take sufficient measures so that the internal temperature will not exceed
the operational temperature during operation.
Air enters the server from the front and exits from the rear.
Summary of Contents for Express5800/R310g-E4
Page 83: ...MEMO...