Release 6.0
192
User Guide
Chapter 6 Initializing a Disk Array (iSCSI)
6.2.3.3 Pool Bind - Completion
When the pool binding is successfully completed, the result of pool binding appears.
Figure 6-14: Pool Bind - Completion.
Perform the following steps:
1. Click
Bind hot spare
to bind a hot spare.
2. If you do not want to bind a hot spare, click
Bind logical disk
to move on to logical disk binding.
Parameter
Description
Bind another pool
Click this hyperlink to reopen the
Pool Bind
page to bind
another pool.
Bind hot spare
Click this hyperlink to open the
Hot Spare Bind
page.
Bind logical disk
Click this hyperlink to open the
Logical Disk Bind
page.
Summary of Contents for M100
Page 25: ...Release 6 0 25 User Guide About Warning Labels Power Supply AC Power Supply ...
Page 27: ...Release 6 0 27 User Guide About Warning Labels Battery ...
Page 29: ...Release 6 0 29 User Guide About Warning Labels Power Cable AC Power Supply ...
Page 40: ...Release 6 0 40 User Guide Chapter 1 Overview 1 2 1 4 Controller CONT ...
Page 48: ...Release 6 0 48 User Guide Chapter 1 Overview 1 2 3 3 Controller CONT ...
Page 260: ...Release 6 0 260 User Guide Chapter 8 Installing Optional Parts Figure 8 12 Removing the DIMMs ...
Page 459: ...NEC Corporation 7 1 Shiba 5 chome Minato ku Tokyo 108 8001 Japan URL http www necstorage com ...