Setting Up the System 2-7
Getting Familiar with the System
Before setting up your system, you should become familiar with the system’s features,
such as the location of your system's front and rear panel switches, indicators and
connectors, etc. Note that this section describes the tower-based system controls
(switches and indicators) and connectors, which are identical for the rack-mount
system.
Front View with Front Door Closed
This figure shows the location of the front system features (tower-based system only).
Figure 2-3 Front Features
A.
System indicators
(See "Front View with Front Door
Opened" later in this chapter).
B.
Keylock
When locked, secures the front door
not allowing access to the front system
controls.
Front View with Front Door Opened
Refer to the following figure and open the front door of the cabinet as follows (tower-
based system only).
1.
If door is locked, unlock the front door.
2.
Pull the bottom of the front door out and tilt up until it is aligned level with the top
of the cabinet, then push the door back directly over the top of the cabinet as far as
it will go.
Summary of Contents for MC2200
Page 1: ... U s e r s G u i d e Server MC2200 ...
Page 2: ...xxx ...
Page 3: ... U s e r s G u i d e Server MC2200 ...
Page 13: ...Using This Guide xi ...
Page 14: ......
Page 26: ...Packard Bell NEC ...
Page 34: ...2 8 Setting Up the System Figure 2 4 Opening the Front Door ...
Page 66: ...Packard Bell NEC ...
Page 96: ...Packard Bell NEC ...
Page 116: ......
Page 117: ...A System Cabling System Cabling Static Precautions Standard Configuration RAID Configuration ...
Page 124: ...Packard Bell NEC ...
Page 125: ...B System Status Hardware Support Information ...
Page 136: ...10 Glossary ...
Page 141: ...xx ...
Page 142: ... 904455 01 ...