Upgrading Your Server 9-37
Hot Add
Take the following procedure to execute Hot Add:
1.
Pull out the server from the rack with the power being on.
2.
Remove the rear access cover.
3.
Locate the slot in which you are going to install an additional board.
NOTE:
Confirm that the PCI Slot Power lamp of the slot in which you
are going to install the PCI board is off.
4.
Push the tab at the tip of the additional slot cover of the slot in which you are going to
install the PCI board to unlock the tab. Open the tab.
IMPORTANT:
Do not open the retention tab to 90 degrees or more.
Doing so could damage the tab.
5.
Remove the additional slot cover.
IMPORTANT:
Keep the removed additional slot cover for future use.
Summary of Contents for N8100-1220F
Page 7: ......
Page 8: ......
Page 9: ......
Page 38: ...1 18 Notes on Using Your Server This page is intentionally left blank...
Page 76: ...2 38 General Description This page is intentionally left blank...
Page 187: ...Configuring Your Server 4 83 3 Setting menu for VD 0 is displayed...
Page 494: ...F 4 Product Configuration Record Table This page is intentionally left blank...