2. Installation and Connection
Express5800/R120d-2M User’s Guide
115
Chapter 2 Preparations
(1) Installation
This server can be mounted to a rack made by NEC or other companies. Mount the server to a rack in the
following procedure.
Preparation
•
Checking rails
•
Installing inner and outer rails
Important Rail for left side has different shape from that for right side. Make sure the
orientation of rails to properly install them.
Checking inner rails
Make sure the orientation of inner rails.
Inner rail (L)
Inner rail (R)
Installing inner rails
1. Mount an inner rail marked as "R" to the right side of the server and "L" to the left side when
viewed the server from front.
2. Align inner rail with three protrusions
on side of server chassis, and slide the
inner rail toward rear of the server.
Make sure the lock at around the
center of inner rail clicks to indicate the
rail is surely locked.
Install another inner rail to opposite
side in similar way.
Checking outer rails
Make sure the orientation of outer rails by viewing "L" or "R" marked on rail.
Outer rail (L)
Outer rail (R)