1. Installing Internal Optional Devices
Express5800/R110f-1E User’s Guide
79
Chapter 2 Preparations
8.
Unscrew the battery bracket securing the
battery.
9.
Write down the installation date (year and
month) on the SET UP DATE LABEL and
attach it to the position shown in the image on
the right.
10. Using the image on the right as a reference,
connect the battery control cable to the battery
pack.
When connecting the cable, check the
orientation of the connector and connect
straight.
11. Attach the extra battery to the battery bracket
by using three screws.
The installation position of the extra battery
varies between PCI 1A and PCI 1B.
12. Attach the bracket using the screws you
removed in step 8.
13. Attach the removed components.
Attach the battery for RAID
Controller installed in PCI 1A
Attach the battery for RAID
Controller installed in PCI 1B
Black marking