Pull out the outer rail (sliding rail for rack side), put the server on 19-inch rack while aligning the 
inner rail (sliding rail for server side) with the outer rail. 

CAUTION

 

 

 

 

Note sufficiently that your fingers may not be caught between a rail and another 
mechanical part when pressing the release lever. 

 

 

 

 

 

 

 

 

 

 

Release lever 

 

IMPORTANT:

   

 

Push the server into the rack until the release lever on the sliding rail is 
locked with clicking sound. Then, press the release lever to push the 
server to the end. 

 

While making sure that the inner rail engages with the outer rail, push the 
server into the rack. 

 

Do not connect any cables to the rear of the server. Cables must be 
connected after installing the cable arm. 

 

Pull out or push the server into the rack for several times to make the 
inner and outer rails move smoothly. (You may feel friction in first 
installation.) 

 

Be sure to fix the server to the rack with the two thumbnuts (used for 
securing the front cover) when containing the server in the rack. 

 

When pulling out the server from the rack, pull it until the release lever is 
locked with clicking sound. 

 

9

Summary of Contents for N8143-93

Page 1: ...N8143 93 19 3 2 856 180253 001 2...

Page 2: ...2 8 4 1 11 12 7 3 10 9 6 5...

Page 3: ...1 1 2 1 3 1 4 1 1 700 743mm 5 2 1 743 900mm 6 1 7 10 8 10 9 10 M5 10 5 M4 11 8 M4 12 1...

Page 4: ...1 1 2 4...

Page 5: ...3 2 4 4...

Page 6: ...5 4...

Page 7: ...2 19 1 19 12 BACK 4U FRONT 2 3 2...

Page 8: ...3 8 2 4 2 6...

Page 9: ...5 19 2...

Page 10: ...4 1 L 3 1 1 2 2 1 L 1...

Page 11: ...743 900 700 743 3 19...

Page 12: ...4 1 2 SA 3 3...

Page 13: ...3...

Page 14: ...1 2 3 4 1...

Page 15: ...1 2 3 4 5 4 N8143 93 856 180253 001 2...

Page 16: ...Conversion Kit must be used for the server and the expansion units to which the Rack Conversion Kit is specified as option Do not use the Rack Conversion Kit for any other devices than specified Doing...

Page 17: ...cribes how to install the rack conversion kit Unpacking The Rack Conversion Kit is composed of the following components After unpacking make sure any parts are not missed or damaged referring to the f...

Page 18: ...5 Arm support 2 1 Depth of rack 743 to 900 mm 6 Arm stopper 1 Cable arm retainer 7 Cable tie 10 For cable arm 8 Washer 10 Used to fix the sliding rails 9 Screw A 10 Metric screw M5 10 Screw B 5 Metric...

Page 19: ...ocedure Step 1 Modify the server from tower type to rack mount type 1 Change the direction of the stabilizer on the bottom server 2 screws 2 Remove the eight nylon rivets from the server Nylon rivets...

Page 20: ...the inner rail then remove the inner rail and bracket both rail assemblies Sliding rail Inner rail and bracket Outer rail Release lever 4 Fix the inner rail and bracket R to the server with four screw...

Page 21: ...5 Fix the inner rail and bracket L to the server with four screws C Screw C Inner rail and bracket R Screw C Screw C Screw C 6...

Page 22: ...identified by the figure Cable arm mount position BACK Core nut mount position Core nut mount position 4U FRONT Slide rail mount position Slide rail mount position 2 Loosen the four fixing screws on...

Page 23: ...washers both left and right sides using eight screws and washers in total 4 Securely tighten the screws that were loosened in Step 2 2 left and right side six screws in total Screw A Washer Screw A W...

Page 24: ...release lever to push the server to the end While making sure that the inner rail engages with the outer rail push the server into the rack Do not connect any cables to the rear of the server Cables...

Page 25: ...f the rack with two screws A and two washers 2 Mount the cable arm to the arm support 1 and the arm bracket with four screws B When the depth of the rack is 743 Screw B Screw B Screw B Arm support 1 C...

Page 26: ...the server side 3 Make sure installation of cable arm While the server is being fixed to the rack you need to rotate and open the cable arm toward the rear of the server when connecting disconnecting...

Page 27: ...djacent servers and or guide rails at both sides Give some slack on the cable between the server and the arm assembly SA This is required to prevent the cable from being stressed when the server is pu...

Page 28: ...3 Insert the arm stopper into the angle hole of the cable arm and secure it with a screw B This completes installation Arm stopper Screw B 13...

Page 29: ...server 1 Remove the arm stopper Loosen the fixing screw and slide the arm stopper to remove it Arm stopper Fixing screw 2 Rotate the cable arm Rotate the cable arm while working with the rear side of...

Page 30: ...be copied or altered without the prior written permission of NEC Corporation 4 All efforts have been made to ensure the accuracy of all information in this User s Guide If you notice any part unclear...