CHAPTER 2 INSTALLATION
Connection of AC CORD-B
NEAX2000 IVS
2
Installation Procedure Manual
Page 84
ND-70928 (E), Issue 1.0
Connection of AC CORD-B
(1)
Connect the AC CORD-B to the CN1 connector on the PZ-PW121 card.
(2)
Screw the ground cable of the AC CORD-B to the frame ground terminal on the PIM.
Figure 2-28 Connection of AC CORD-B
CORD BUSH
BASE
TERMINAL BLOCKS
FRONT
PZ-PW121
CN1
AC CORD-B
AC CORD-D
TO 120V/240V AC POWER SOURCE