CHAPTER 2 INSTALLATION
Internal Battery Connection
NEAX2000 IVS
2
Installation Procedure Manual
Page 96
ND-70928 (E), Issue 1.0
Internal Battery Connection
(1)
Connect the BATT CA INT cable to the batteries as shown below.
(2)
Mount the battery unit (24V DC, 3.2-3.4AH) into the PIM.
(3)
Plug the BATT CA INT connector into the BATT1 connector on the PZ-PW121 card.
(4)
Secure the batteries and battery cable using tie wraps.
Figure 2-37 Internal Battery Mounting (1 of 2)
67 mm
DIMENSION OF BATTERY
(2.6 inch)
134 mm
(5.3 inch)
60 mm
(2.4 inch)
Recommended Batteries
Yuasa NPH-3.2-12
Matsushita LCR-12V 3.4NE
BLUE/BLACK
INTERNAL BATTERY UNIT
(24V DC, 3.2 TO 3.4AH)
PIM
+
+
–
RED
BATT CA INT
BLACK
TO BATT1
CONNECTOR
ON PZ-PW121
–