CHAPTER 2 INSTALLATION
Floor Standing Installation
NEAX2000 IVS
2
Installation Procedure Manual
ND-70928 (E), Issue 1.0
Page 55
•
For Fixed Equipment
(1) Fix the BASE PLATE to the floor with anchor bolts.
(2) Fix the BASE to the BASE PLATE with screws. See
Figure 2-12
.
(3) Fix the PIM onto the BASE with screws. See
Figure 2-13
.
•
For Stationary Equipment
(1) Fix the BASE TRAY to the floor with anchor bolts.
(2) Fix the PIM onto the BASE with screws. See
Figure 2-13
.
(3) Place the Module and the BASE on the BASE TRAY. See
Figure 2-
14
.
• Connect PIMs with screws. See
Figure 2-17
.
• Install the I/F BRACKET to the top-stack PIMs if the equipment is
stacked with five or more PIMs. See “Installation of I/F BRACKET” on
Page 69
.
• Install the TOP COVER to the top-stack PIM. See “Installation of TOP
COVER” on
Page 70
.
• Install the MOUNTING BRACKET to the top-stack PIM if the equipment
is stacked with four or more PIMs. See “Installation of MOUNTING
BRACKET” on
Page 71
.
• Carefully review every step above to ensure that all necessary screws
are properly placed and tightened.