CHAPTER 2 INSTALLATION
Floor Standing Installation
NEAX2000 IVS
2
Installation Procedure Manual
Page 68
ND-70928 (E), Issue 1.0
(3) Hook the PIM onto the BUILD PLATE’s hooks.
(4) Slide the PIM backward until it comes to the back end.
(5) Secure the PIM with three screws.
Figure 2-17 Connection of Modules
SCREWS