CHAPTER 2 INSTALLATION
Installation Procedure
NEAX2000 IVS Retrofit System Guide
ND-71075 (E), Issue 1.0
Page 15
INSTALLATION PROCEDURE
Install the Retrofit system according to the following procedure.
(1)
Turn the system power off.
(2)
Unplug the former MP card (PN-CP00/CP03/CP07) from the MP slot.
(3)
On the MP card (PN-CP16), set the switches to appropriate position.
See “
Lamp Indications and Switch Settings
.
(4)
Mount the MP card (PN-CP16) into the MP slot.
(5)
Unplug the former FP card (PN-CP01) from the FP slot.
(6)
On the FP card (PN-CP17), set the switches to appropriate position.
See “
Lamp Indications and Switch Settings
.
(7)
Mount the FP card (PN-CP17) into the FP slot.
(8)
Unplug former clock card (PN-CK00) from PIM0.
This card is no longer required. PN-CP16 has built in clock.
(9)
Unplug former Expansion memory (PN-ME00).
This card must be replaced with new PZ-M537.
(10) Unplug former SPN-AP00A. This card must be replaced with SPN-AP00B for SMDR, MCI,
PMS, Hotel printer. New card must be reprogrammed. Do not attempt to load old AP00A
data to new AP00B. It must be rekeyed.
(11) After mounting the cards, turn the system power on.
(12) For North American installations, follow the documentation received with PN-CP16 to
register software.
(13) Set necessary system data.
(14) Test all stations and trunks for correct operation.
Caution
When the operating power is being supplied to MP card, do not plug/unplug the MP card into/
from its mounting slot.