7-18
Issue 2 December 1995
NEAX 2400 Switch Administration
5. Look at the value in the DATA field and write the value on the following line
NOTE:
Do not change the value in the DATA field until you consult with
your switch administrator. This index contains other fields that
control features not related to MCI.
6. Enter 01 in the DATA field.
You have completed the NEAX 2400 MCI switch administration. Proceed to
Chapter 8, "Switch Integration Device Administration", to configure the switch
integration device.
Current DATA value: _________
Summary of Contents for NEAX 2400
Page 2: ...Blank Page ...
Page 8: ...Contents viii Issue 2 December 1995 ...
Page 36: ...2 10 Issue 2 December 1995 Switch Integration Device Basics ...
Page 42: ...3 6 Issue 2 December 1995 Switch Integration Planning ...
Page 52: ...4 10 Issue 2 December 1995 Hardware Installation ...
Page 70: ...6 10 Issue 2 December 1995 Administering the INTUITY System for the NEAX Integration ...
Page 104: ...8 16 Issue 2 December 1995 Switch Integration Device Administration ...
Page 122: ...A 10 Issue 2 December 1995 ...
Page 128: ...B 6 Issue 2 December 1995 ...